BSA 376 Week 2 Learning Team Project Draft Riordan Manufacturing Outline

BSA 376 Week 2 Learning Team Project Draft Riordan Manufacturing Outline
This Tutorial was Purchased: 8 and Rated: A+ by students like you.
Availability: In Stock
Price: $5.60 $4.95
Qty:     - OR -   Add to Wish List

BSA 376 Week 2 Learning Team Project Draft Riordan Manufacturing Outline Description

BSA 376 Week 2 Learning Team Project Draft Riordan Manufacturing Outline

Submit Week 2 Team Project Draft to Learning Team Folder Resource: Service Request rm-002 for Riordan Manufacturing Review the Service Request rm-002 for Riordan Manufacturing. Define scope and stakeholders associated with the project. Identify preliminary assignments and tasks for each member. Create a detailed outline for each section. Draft the first 4 to 6 pages to include the following:

 Statement of scope and goals o Specify what functions are included in the project.

 Supporting measures for success o Specify tangible measures for determining the relative degree of success of the completed project. Measures must correlate with goals specified in the first section.

 Summary of project feasibility o Include specific operational, technical, and economic feasibility analysis. Operational and technical issues must specify how each issue is addressed. The economic analysis must include specific benefit and cost areas

 Current business process summary o Provide a flowchart and a separate high-level logical data flow diagram of the process.

Proposed system requirement list o List specific individual requirement needs in measurable and objective terms.

Reviews

Write a review

Your Name:


Your Review: Note: HTML is not translated!

Rating: Bad           Good

Enter the code in the box below:



Tags: BSA 376 Week 2 Learning Team Project Draft Riordan Manufacturing Outline